this is the written out text for the provided case studies.

 

Smithills Open Farm

A thriving family run open farm located in Bolton required various specs and sizes of rollershutter, from manual push up shutters on the bin store, to 5m x 5m tube motorshutter to secure main entrance to 2 ½ m x 2 ½ m plastisol latch on party room. From order to installation SSS measured, manufactured and installed all doors within 2 weeks.

 

Ford Garage Wigan

SSS oversaw the entire security of the ford garage showroom, from steel hinged personnel doors to fire escapes to roller shutters, powder coated on the parts desk, to all the sectional doors with safety devices/loops in floor to detect cars frequently entering and exiting. To all doors on the valeting bays. SSS met the demands of a modern spec of the building and garage. This was completed swiftly in 2 weeks.

 

Halliwell Business Park

SSS were required to secure an entire business park. Installing 14 x 4 x 4 high using direct drive insulated doors on all main entrances, all fire escapes, all entrance and all glazed steel hinged doors. To comply to exact customer preference of a modern look.

 

Basilica Leeds

On the Basilica apartment block in Leeds City Centre. 100% duty rated car park shutter with space for 75 cars and remote control access included. 3 exit loop fitted, includes twin skin insulated fully punched vision windows. 15 square meters of vented free space above. Vandike Brown upgrade from old sectional to remote controlled. Project was completed in 2 days with minimum disruption to the tenants of the site.